Delay factors for international engineer-procure-construct (EPC) high-speed rail construction projects

Download (95.38 kB)
conference contribution
posted on 2018-08-02, 14:40 authored by Chris GoodierChris Goodier, Yuxiang Zhang, Wayne Lord, Robby SoetantoRobby Soetanto
Due to complex projects and diverse risks, schedule delay has always been one of the major problems in high-speed rail construction. Chinese infrastructure companies are the main force of the international market after the Chinese government implemented the One Belt and One Road initiative (OBOR). Currently, more than 10 international engineer-procure-construct high-speed rail (IEPCHSR) projects are being considered or undertaken overseas by Chinese companies. However, delay has severe consequences for the progress of most IEPCHSR projects. The aim of this study is to identify the significant delay factors for IEPCHSR projects. This study was conducted as an exploratory study through literature review and semi-structured interview with seven managers from Chinese IEPCHSR related companies. Result reveals that some delay factors concluded from general international infrastructure projects are also applicable in IEPCHSR projects. In the engineering phase, inappropriate management in design management, inefficient land acquisition, design changes and lack of EPC subsidiary contract management for HSR projects are likely to cause delays. In the procurement phase, improper procurement prepared, under-estimated procurement price, unreliable agency, inefficient logistics in equipment and labour are leading causes. In the construction phase, the significant delay factors are improper construction task planning, inexperienced site supervision, ineffective technical standard management and ineffective continuous progress payment. Further study will analyse their interrelationships with Chinese construction companies using a questionnaire survey and structural equation modelling (SEM) technique. The result from this study should enable the Chinese HSR practitioners to gain a better understanding of the inter-relationships between the different potential delay factors.

History

School

  • Architecture, Building and Civil Engineering

Published in

ARCOM- A Productive Relationship: Balancing Fragmentation and Integration

Citation

GOODIER, C.I. ... et al., 2018. Delay factors for international engineer-procure-construct (EPC) high-speed rail construction projects. Presented at the 34th Conference and Annual General Meeting : A Productive Relationship: Balancing Fragmentation and Integration (ARCOM 2018), Belfast, UK, 3-5th September, pp.490-499.

Publisher

ARCOM

Version

  • AM (Accepted Manuscript)

Publisher statement

This work is made available according to the conditions of the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0) licence. Full details of this licence are available at: https://creativecommons.org/licenses/by-nc-nd/4.0/

Acceptance date

2018-07-22

Publication date

2018

Notes

This is a conference paper.

Language

  • en

Location

Belfast, UK

Usage metrics

    Loughborough Publications

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC