This paper highlights the main steps taken in the process of developing a Performance Improvement Plan (PIP) for Kisumu
Water and Sewerage Company (KIWASCO), as part of the WUP capacity-building project funded by SIDA, which
was facilitated by WEDC in partnership with Severn Trent International. As a departure from previous consultancies, the
utility staff actually developed the PIP themselves, during which process they built their capacity in strategic planning
processes. Although the project was implemented during a difficult period in which KIWASCO was in a transition, with
several changes in senior management, it is felt that the involvement of middle managers in the PIP process ensured that
maximum benefits were derived from the project.
History
School
Architecture, Building and Civil Engineering
Published in
WEDC Conference
Pages
301709 bytes
Citation
KAYAGA, S. ... et al, 2005. Improving utility management : case study from Kisumu, Kenya. IN: Kayaga, S. (ed). Maximising the benefits from water and environmental sanitation: Proceedings of the 31st WEDC International Conference, Kampala, Uganda, 31 October-4 November 2005, pp. 172-175.
This work is made available according to the conditions of the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0) licence. Full details of this licence are available at: https://creativecommons.org/licenses/by-nc-nd/4.0/