posted on 2018-02-12, 15:10authored byCaetano C. Dorea, J.G. Williams, F. Boulay-Cote, G. Bedard, C. Bouchard
Previous work revealed the potential of an inclined plate settler (IPS) for water treatment in emergency relief applications. Whilst preliminary data demonstrated the tested IPS prototype’s capacity to achieve stable turbidity reductions, further optimisation was warranted. This paper reports on the optimisation and preliminary field testing of an IPS prototype. Trials revealed that after system modification, treatment objectives with regards to turbidity reductions (i.e. < 5 NTU) could be achieved. Such positive results were largely due to the addition of a hydraulic flocculation (conditioning) stage.
History
School
Architecture, Building and Civil Engineering
Research Unit
Water, Engineering and Development Centre (WEDC)
Published in
WEDC Conference
Citation
DOREA, C.C. ... et al, 2014. Inclined plate settling for emergency water treatment: towards optimisation. IN: Shaw, R.J., Anh, N.V. and Dang, T.H. (eds). Sustainable water and sanitation services for all in a fast changing world: Proceedings of the 37th WEDC International Conference, Hanoi, Vietnam, 15-19 September 2014, 4pp.
This work is made available according to the conditions of the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0) licence. Full details of this licence are available at: https://creativecommons.org/licenses/by-nc-nd/4.0/