posted on 2018-02-12, 15:07authored byKwadwo Ansong Asante
The Weija and Kpong Reservoirs were constructed as impoundments to satisfy the increasing demands for hydroelectric
power and water for domestic, agricultural and industrial purposes. The Weija Reservoir, created in 1977 on the Densu River is about 116 km long. The Weija dam is a rock-and earth-filled structure located about 10 km from the mouth of the River Densu. The reservoir provided industrial and domestic water supplies to the southwestern part of Accra and for fisheries. The Kpong reservoir created in 1981 was formed after the closure of the Volta Dam. It created the potential for two industries, agriculture by irrigation and fishing. The reservoir is also the main source of water supply to the Accra-Tema Metropolitan Area. There is an urgent need to gather, analyse and collate
nutrient data in order to mitigate adverse trends for maximum utilisation of these multipurpose reservoirs.
History
School
Architecture, Building and Civil Engineering
Research Unit
Water, Engineering and Development Centre (WEDC)
Published in
WEDC Conference
Citation
ASANTE, K.A., 1999. Nutrient status of two Ghanaian water reservoirs. IN: Pickford, J. (ed). Integrated development for water supply and sanitation: Proceedings of the 25th WEDC International Conference, Addis Ababa, Ethiopia, 30 August-2 September 1999, pp.276-279.
This work is made available according to the conditions of the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0) licence. Full details of this licence are available at: https://creativecommons.org/licenses/by-nc-nd/4.0/