Loughborough University
Browse

Tailwater recycling for hydro-power generation, Niger River

Download (67.2 kB)
conference contribution
posted on 2018-02-12, 15:09 authored by A.W. Alayande, O.A. Bamgboye
In this paper an alternative source of water for the effective running of the Kainji and Jebba hydro-power stations were found in recycling the Jebba tailwater to the headwaters of the Malendo river systems. The result shows that a recycle of 60% of the flow at Lokoja back to Kainji reservoir will guarantee adequate supply of the daily water requirements for the generation of the full installed capacities of 760MW and 540MW of electricity at Kainj and Jebba.

History

School

  • Architecture, Building and Civil Engineering

Research Unit

  • Water, Engineering and Development Centre (WEDC)

Published in

WEDC Conference

Citation

ALAYANDE, A.W. and BAMBOYE, O.A., 2003. Tailwater recycling for hydro-power generation, Niger River. IN: Harvey, P. (ed). Towards the millennium development goals - Actions for water and environmental sanitation: Proceedings of the 29th WEDC International Conference, Abuja, Nigeria, 22-26 September 2003, pp. 175-177.

Publisher

© WEDC, Loughborough University

Version

  • VoR (Version of Record)

Publisher statement

This work is made available according to the conditions of the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0) licence. Full details of this licence are available at: https://creativecommons.org/licenses/by-nc-nd/4.0/

Publication date

2003

Notes

This is a conference paper.

Other identifier

WEDC_ID:13069

Language

  • en

Usage metrics

    WEDC 29th International Conference

    Categories

    No categories selected

    Keywords

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC