RJS_TEC_WESA_Clay_groundwater_dam_with_an_upstream_well_designed_to_cope_with_flooding_in_the_wet_season.png (300.17 kB)

Clay groundwater dam with an upstream well designed to cope with flooding in the wet season

Download (300.17 kB)
figure
posted on 08.05.2019 by Glenda McMahon, Rod Shaw
Clay groundwater dam with an upstream well designed to cope with flooding in the wet season

Funding

WEDC, Loughborough University

History

Exports

Logo branding

Exports