Loughborough University
Browse
- No file added yet -

Clash detection or clash avoidance? An investigation into coordination problems in 3D BIM

Download (3.37 MB)
journal contribution
posted on 2017-09-08, 13:08 authored by Anderson O. Akponeware, Zulfikar Adamu
Early collaboration is crucial if the final design is to be clash-free, and automation processes through Building Information Modelling (BIM) have the capacity to reduce clashes through 3D design coordination. Yet, current design practices are still dependent on clash detection and contemporary literature presents several reasons for this. This paper investigates the root causes of clashes with respect to achieving “clash avoidance” as proposed in PAS 1192-2 design phase specifications for BIM in the UK. Empirical data from BIM coordinators around the world was collected and analyzed using explanatory sequential mixed-methods. It was found that: (i) isolated working was the prime cause of high occurrences of clashes linked to mechanical, electrical and plumbing (MEP) 3D BIM systems; (ii) there is a link between non-BIM specific training (or the professional qualifications) of design practitioners with the high incidence of clashes; and (iii) the current structure of cloud-based common data environments (CDEs) does not facilitate clash avoidance and in fact, encourages isolated working in the early design stage by creating “digital information silos”. A conceptual framework for an open work in progress (OWIP) has been proposed to address this problem. These findings point to the need for more transparency during collaboration through CDE where designers from multidisciplinary backgrounds can engage in concurrent co-creation. This transparent and inclusive process could have consequences on how future architectural, engineering and construction (AEC) professionals are trained.

History

School

  • Architecture, Building and Civil Engineering

Published in

Buildings

Volume

7

Issue

3

Citation

AKPONEWARE, A.O. and ADAMU, Z.A., 2017. Clash detection or clash avoidance? An investigation into coordination problems in 3D BIM. Buildings, 7 (3), 75.

Publisher

MDPI © The authors

Version

  • VoR (Version of Record)

Publisher statement

This work is made available according to the conditions of the Creative Commons Attribution 4.0 International (CC BY 4.0) licence. Full details of this licence are available at: http://creativecommons.org/licenses/ by/4.0/

Publication date

2017

Notes

This is an Open Access Article. Is is published by MDPI under the Creative Commons Attribution 4.0 Licence (CC BY). Full details of this licence are available at: http://creativecommons.org/licenses/by/4.0/

eISSN

2075-5309

Language

  • en