M-PERT: Manual project-duration estimation technique for teaching scheduling basics

Download (6.04 MB)
journal contribution
posted on 2018-04-27, 08:41 authored by Pablo Ballesteros-Perez
© 2017 American Society of Civil Engineers. The program evaluation and review technique (PERT) has become a classic project management tool for estimating project duration when the activities have uncertain durations. However, despite its simplicity and widespread adoption, the original PERT, in neglecting the merge event bias, significantly underestimated the duration average and overestimated the duration variance of real-life projects. To avoid these and other shortcomings, many authors have worked over the last 60 years at producing interesting alternative PERT extensions. This paper proposes joining the most relevant of those to create a new reformulated PERT, named M-PERT. This reformulation is quite accurate when estimating real project duration, but allows for a number of interesting network modeling features that the original PERT lacked: probabilistic alternative paths, activity self-loops, minima of activity sets, and correlation between activities. However, unlike similar scheduling methods, M-PERT allows manual calculation through a recursive merging procedure that downsizes the network until the last standing activity represents the whole (or remaining) project duration. Hence, M-PERT constitutes an attractive tool for teaching scheduling basics to engineering students in a more intuitive way, with or without the assistance of computer-based simulations or software. One full case study is described and future research paths are suggested.

History

School

  • Architecture, Building and Civil Engineering

Published in

Journal of Construction Engineering and Management

Volume

143

Issue

9

Citation

BALLESTEROS-PEREZ, P., 2017. M-PERT: Manual project-duration estimation technique for teaching scheduling basics. Journal of Construction Engineering and Management, 143(9): 04017063.

Publisher

© ASCE

Version

  • AM (Accepted Manuscript)

Acceptance date

2017-03-20

Publication date

2017

Notes

This material may be downloaded for personal use only. Any other use requires prior permission of the American Society of Civil Engineers. This material may be found at https://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001358

ISSN

0733-9364

Language

  • en