Measurement of construction productivity: brickwork and blockwork. Part B
journal contribution
posted on 2014-06-26, 15:23authored byAnanda K.W. Jayawardane, Andrew Price, Francis C. Harris
The assumptions in Part A of this paper were tested by analysing the data shown in
the tables using the MINITAB package. Brickwork and blockwork were analysed
separately in four main steps, namely: correlation, graphs, variance tests and
regression analysis.
History
School
Architecture, Building and Civil Engineering
Citation
JAYAWARDANE, A.K.F., PRICE A.D.F. and HARRIS, F., 1995. Measurement of construction productivity: brickwork and blockwork. Part B. Building Research and Information, 23 (3), pp. 147 - 155.