Realisation of a novel functionally redundant actuation system for a railway track-switch

Download (8.14 MB)
journal contribution
posted on 2021-01-14, 15:06 authored by Osama Olaby, Saikat Dutta, Tim Harrison, Christopher Ward, Roger Dixon
This paper focuses on modelling, control, realisation and performance analysis of a full-scale demonstrator for a novel railway track switch. For over a century, railway track switches (or points) have been allowing trains to safely change between routes. As they are safety-critical elements of the rail network, when they fail, the signalling system will prevent trains from using that route. This means poor reliability (or lack of availability) leads to significant delays and costs; hence there is huge interest from researchers and engineers in improving the overall reliability of track switches. This paper presents new results, which represent a meaningful first step toward a revolution in the way track switches are actuated. A “REPOINT-Light” railway track switch demonstrator is introduced which uses a new concept of locking to allow redundant actuation with three actuator bearers operating under closed-loop feedback control. The new concept, its control system and its mechanical viability are tested in experiments at the Great Central Railway in the UK. To support the design of the actuators and the control system, a dynamic simulation model is developed by co-simulation involving Simulink and Simpack. The experimental results presented are used to validate the models and the paper discusses how the models themselves are used as the vehicle for the design of feedback controllers. Virtual testing of the controllers in simulation is a vital step prior to the implementation and deployment of the controllers in the demonstrator switch. The major contribution of this work is demonstrating, for the first time at full scale on a real-world track switch, that it is possible to use one-out-of-three actuator redundancy to provide fault-tolerant operation of railway track switch.

Funding

The research described has been supported by Railway Safety and Standards Board (RSSB), UK {the in grant number RSSB/2029S(2015)}, for the project titled “REPOINT Phase 3: Repoint Light Prototype Design and Build”.

History

School

  • Mechanical, Electrical and Manufacturing Engineering

Published in

Applied Sciences

Volume

11

Issue

2

Publisher

MDPI AG

Version

  • VoR (Version of Record)

Rights holder

© The Authors

Publisher statement

This is an Open Access Article. It is published by MDPI under the Creative Commons Attribution 4.0 International Licence (CC BY 4.0). Full details of this licence are available at: https://creativecommons.org/licenses/by/4.0/

Acceptance date

2021-01-08

Publication date

2021-01-13

Copyright date

2021

ISSN

2076-3417

eISSN

2076-3417

Language

  • en

Depositor

Dr Tim Harrison. Deposit date: 13 January 2021

Article number

702

Usage metrics

    Loughborough Publications

    Categories

    No categories selected

    Licence

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC