posted on 2018-08-09, 08:26authored byMukesh Kashyap
Safety management to avoid collapses during structural refurbishments of buildings has been of great concern to site professionals and management involved in structural refurbishments. The problems hindering safety in refurbishment projects were identified as: process bottlenecks, absence of a structured refurbishment process and limitations in the use of decision support tools. The aim of the research was to develop a Safety-Integrated Refurbishment Process Model (RPM) and establish its viability as the basis for a Decision Support System (DSS) to avoid structural collapses in refurbishment projects. [Continues.]
This work is made available according to the conditions of the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0) licence. Full details of this licence are available at: https://creativecommons.org/licenses/by-nc-nd/4.0/
Publication date
2007
Notes
A Doctoral Thesis. Submitted in partial fulfilment of the requirements for the award of Doctor of Philosophy at Loughborough University.