posted on 2016-03-04, 11:47authored byRobert D. Evans
Ground penetrating radar (GPR) technology has existed for many decades, but it has only
been in the last 20 to 30 years that it has undergone great development for use in near surface
ground investigations. The early 1980’s saw the first major developments in the application of
GPR for pavements (i.e. engineered structures designed to carry traffic loads), and it is now
an established investigation technique, with generic information included in several national
standard guidance documents. Analysis of GPR data can provide information on layer depths,
material condition, moisture, voiding, reinforcement and location of other features. Assessing
the condition of pavements, in order to plan subsequent maintenance, is essential to allow the
efficient long-term functioning of the structure and GPR has enhanced and improved the
range and certainty of information that can be obtained from pavement investigations.
Despite the recent establishment of the technique in pavement investigation, the current
situation is one in which GPR is used routinely for pavement projects in only a minority of
countries, and the specialist nature of the technique and the sometimes variable results that are
obtained can mean that there is both a lack of appreciation and a lack of awareness of the
potential information that GPR can provide. The fact that GPR is still a developing technique,
and that many aspects of its use are specialised in their nature, means that there are also
several technical aspects of GPR pavement investigations which have not been fully
researched, and knowledge of the response of GPR to some material conditions has not been
fully established.
The overall aim of this EngD research project was to provide improved pavement
investigation capabilities by enhancing the methodologies and procedures used to obtain
information from GPR. Several discrete research topics were addressed through various
research methods including a literature review, fieldwork investigations, experimental laboratory investigations and a review of previously collected data. The findings of the
research allowed conclusions and recommendations to be made regarding improved fieldwork
methodologies, enhancing information and determining material condition from previously
collected GPR data, assessing the effect of pavement temperature and moisture condition on
GPR data and also on managing errors and uncertainty in GPR data. During the EngD project,
a number of documents and presentations have been made to publicise the findings both
within the EngD sponsoring company (Jacobs) and externally, and an in-house GPR
capability has been established within Jacobs as a direct result of the EngD project.
Funding
This thesis is a result of research conducted from 2004 to 2008 as part of an EngD project, in
collaboration between the Centre for Innovative and Collaborative Engineering (CICE) at
Loughborough University and Jacobs Engineering UK Ltd.
History
School
Architecture, Building and Civil Engineering
Research Unit
Centre for Innovative and Collaborative Engineering (CICE)
This work is made available according to the conditions of the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0) licence. Full details of this licence are available at: https://creativecommons.org/licenses/by-nc-nd/4.0/
Publication date
2010
Notes
A dissertation thesis submitted in partial fulfilment of the requirements for the award of the degree Doctor of Engineering (EngD), at Loughborough University.